I went to Harumi Wharf to see "Tokyo Minato matsuri".
The construction of Loop Line 2 is also underway.
The section between Toranomon and Shimbashi was opened in March 2014, but in March 2016, the section between Shimbashi and Toyosu will be connected and will be fully opened.
Harumi's landfill was completed in April 1929 as Tsukishima No. 4 (Tokyo Bay Landfill No. 4), but it was scheduled to be held in 1940 (1940, Koki 2600) The purpose was to make it the main venue, and Kachidokibashi was also constructed accordingly. A commemorative plate is installed on the site of the Expo Secretariat.
In the Tokyo Minato matsuri, the survey vessel Ocean (Japan Coast Guard), the dredging vessel Kairyu (Tokyo Port and Harbor Bureau), the training vessel Kaitaka Maru (Tokyo University of Marine Science and Technology), and the escort vessel Yugiri (Marine Self Defense Force).

