■We introduced the changes that are taking place on Chuo-dori in May this year under the title "May, Changing Chuo-dori (Ginza-Nihonbashi)". → Click here for this article
It's been six months, so I've confirmed the changes since then, so please take a look. The place I photographed for the first time this time is (new this time).
(1) Ginza 6-chome 10 District Type 1 Urban Redevelopment Project [Matsuzakaya Ginza Store Ruins, etc.]
①13 floors above ground (66m high) and 6 floors below ground. Scheduled to be completed on November 30, 2016.
②One of the largest commercial facilities in the Ginza area. Kanze Noh Theater is also located.
■There was a building demolition leftover in the construction area in May, but this time it was removed.
It is an orderly construction site.


(2) Ginza 5-chome Redevelopment Plan [Rebuilding at the corner of Ginza 4-chome intersection]
①12 floors above ground (56m high) and 2 floors below ground. It is scheduled to be completed on May 15, 2016.
②Beer Hall Lion Ginza 5-chome Store, Nissan Ginza Gallery, Tsuzureya
Operations are scheduled to resume after the completion of the new building.
■The existing building has been demolished, and it is different from the Ginza 4-chome intersection that has been familiar to us for a long time.
It 's going to be.

(3) Rebuilding of the Okura Main Building [Rebuilding at the corner of Ginza 2-chome intersection]
①12 floors above ground (56m high) and 3 floors below ground. It is scheduled to be completed on August 31, 2016.
■The existing building has been dismantled and bent behind it.
De Beers Ginza Building, a multi-purpose commercial complex where Third became a hot topic (11th floor 2)
Completed in 007) is becoming noticeable.

4) Itoya Main Store Rebuilding Plan [Ginza 2-chome]
①13 floors above ground (66m high) and 2 floors below ground. It is scheduled to be completed on March 15, 2015.
②In addition to retail stores, restaurants and conference rooms on the upper floor, and underground.
A multi-purpose hall is planned.
■The building under construction is covered with a sheet covering.

(5) New construction of Ginza 1-chome A block (opened)
①12 floors above ground (66m high) and 3 floors below ground.
■As a commercial facility "KIRARITO GINZA", 10
It opened on the 30th of the month.



★(New this time) Ginza Theatre Building ("Hotel Seiyo Ginza" and "Ginza Theatre Cinema"
The building where I moved in) was dismantled. [In the corner of the intersection of Ginza Street
Rebuilding
①After rebuilding, the smartphone will be used as “Konami Creative Center Ginza (tentative name)”.
Consider the development base for game development and facilities for communication with customers.
I think it's done.
■We are currently under cover and dismantling work.


★(New this time) Tokyo Square Garden (existing building)
□Kyobashi no Oka
It is a pleasant green Kyobashi hill.
The hill of Kyobashi, which is about 30m high and about 3,000m2 in the low-rise area, is located in the city center.
It was created for the purpose of contributing to the reduction of the wind and the formation of the wind path.
It is a part of the Green Road Network that we are working on.

□The Central FM headquarters is located on the first basement floor.
We are an FM radio station in Chuo-ku. As the only local community FM radio station in Chuo-ku
I'm doing my best. The sender is located on the GINZA KABUKIZA store.

□On the 6th floor, there is the Chuo City Environmental Information Center.
"Chuo City Environmental Information Center is working on various environmental issues such as global warming.
In addition to learning easy-to-understand ways, inhabitants of the ward, businesses, and wards work together to circle of environmental activities
It is a facility established by the ward to expand the area.
The Environmental Information Center provides digital content and information on the environment.
Anyone can learn through exhibitions. Also, “About the environment”
"I want to learn", "I want to participate in environmental activities", "I want to improve the environment"
I would like to support everyone's positive feelings. One Power
What we couldn't do was make friends, the number of friends increased, and the circle of environmental activities was expanded.
You may be able to achieve it. Local communities work together to promote environmental activities
As a base for practicing activities, we gather and disseminate various information to many people.
We are aiming for facilities that can be used. Please feel free to contact us.
Please join me." (From the Chuo City Environmental Information Center website)

(6-1) Kyobashi 2-chome West District Type 1 Urban Redevelopment Project Facility Building (Redevelopment Building)
①32 floors above ground (170.25m high) and 3 floors below ground. August 31, 2016
It is scheduled to be completed.
(6-2) Kyobashi 2-chome West District Type 1 Urban Redevelopment Project Facility Building (History building)
Refurbishment work [Meijiya Kyobashi Building seismic isolation work]
①8 floors above ground (30.32m high) and 2 floors below ground. Completed on July 31, 2015
It is scheduled to be completed.
②The Meijiya Kyobashi Store will resume business after the completion of seismic isolation work.
■The cover of the entire building of Meijiya is the same as in May.
The tall building behind is the Kyobashi Trust Tower, an office building completed this year.
(C ourtyard by Marriott Tokyo Station Hotel)

★(New this time) Kyobashi 1-chome Hotel Plan
①15 floors above ground (55m high) and 0 floors below ground. It is scheduled to be completed on October 31, 2016.
■Demolition of buildings. The building plan is 0 floors underground, rare in recent buildings
It looks like a building with no basement.


(7) N Project [Nihonbashi 3-chome]
①12 floors above ground, 2 floors of towers (68m high), 4 floors underground. end of April, 2015
It is scheduled to be completed.
②Rebuilding of the headquarters building of DIC Corporation.
■You can understand the whole building.

(8) Nihonbashi 2-chome District Type 1 Urban Redevelopment Project (Block C)
①31 floors above ground, 1 floor of tower building (180m high), 5 floors below ground. 2018 12
It is scheduled to be completed at the end of the month.
②A super high-rise office building with Takashimaya on the lower floors. Next door Takashi Nihonbashi
Maya will be connected in the air corridor.
■The demolition work is underway.


(9) Nihonbashi 2-chome District North District New Construction [Nihonbashi Intersection Corner Area]
①35 floors above ground (180m high) and 4 floors below ground. Completed in late November 2017
Schedule.
②In conjunction with development, connection with the subway Nihombashi Station, station squares, tourist information centers, etc.
It is planned to be maintained.
■The current state of the building and the villa of the shop on the first floor of the building where the intersection is dismantled.



(10) Nihonbashi 1-chome Project [Nihonbashi Intersection Corner Area]
①13 floors above ground (55.98m high) and 2 floors below ground. It is scheduled to be completed at the end of February 2015.
②An office building directly connected to the subway.
■The whole building is now.

★(New this time) Fukutoku-jinja Shrine and its adjacent area
①The new shrine of Fukutoku Shrine was completed, and general worship began on October 24.
□Torii of Fukutoku-jinja Shrine

□Fukutoku-jinja Shrine Goyu

□(Tentative name) Fukutoku no Mori

★(North side of Fukutoku-jinja Shrine) (tentative name) Shin-Tokyo Takeda Building
①24 floors above ground (123.15m up to 123.65m) and 4 floors below ground. end of October, 2017
It is scheduled to be completed.
■The demolition work is underway.
★(New this time) Nihonbashi Muromachi 3-chome District Type 1 Urban Redevelopment Project
①Demolition work (removal work period from November 14, 2014 to 2015)
July 30
■At present, a form for notification of demolition work is posted.
□Current status of redevelopment project area at the intersection of Muromachi 3-chome

□Redevelopment Project Scope

■I was worried about the uneven height of the surrounding buildings due to the scenery of the city. In addition, for disaster prevention, in the case of buildings with large glass surfaces, I was worried about the danger of glass fragments falling when there was an earthquake more than expected.
I would like to expect the continuation of close exchange of opinions between businesses and the government, such as unified urban landscapes and urban disaster prevention.
The above