I'm a little worried about the construction company building (continued)
In a blog article in November 2024, we introduced the new company building TODA BUILDING (1-7-1 Kyobashi), which Toda Construction Co., Ltd. has just opened, but one more thing in Chuo-ku is a little worried There is a building of a construction company.
A few minutes walk from TODA BUILDING. The head office building of Shimizu Construction Co., Ltd. (2-16-1 Kyobashi) located along Showa-dori was completed in May 2012. The combined appearance of the panel is very impressive, and each panel is released and finished with concrete. If you look closely, beautiful wood grains are emerging on the surface of the pillar pillar and the wall inside the entrance, and it seems that a very time-consuming construction method called the "Sugi plate real formwork concrete method" is used. Every time I pass in front, I feel the commitment of Shimizu Corporation, who is also a designer and builder.
According to Shimizu Corporation HP, this building is designed as a building that enhances disaster prevention performance while aiming for zero CO2 emissions and works reliably even in the event of a disaster such as an earthquake, based on the concept of "zero carbon building that serves as a disaster prevention base in the city." For example, it also assumes a role as a facility to support those who cannot return home. Do you think that the entire building is full of ideas and thoughts of Shimizu Corporation, both exterior and contents?